Skip to content
Sun Software logo with the tagline Engineering Beyond Code
Application Modernization

Application modernization that keeps what already works.

Our application modernization services stabilize, refactor and improve aging applications while protecting the functionality, data and daily operations you rely on.

service-briefScoped proposal
  • CategorySoftware & SaaS
  • EngagementScoped proposal
  • First stepDiscovery call
  • Reply withinOne business day
01

50+

Countries our clients come from

Mostly the US, UK, Germany, Canada and Australia.

02

1,685

Reviews on Fiverr

Public, and open for anyone to read.

03

16

People on the team

Working together since 2020.

04

4.9

Out of 5 on Fiverr

Average across all reviews.

Your old system still runs the business. Is it safe to change?

Old software keeps working until someone has to change it. Published figures show what keeping it going costs.

  • 63%

    of professional developers named technical debt as a frustration at work, the most common one

    What we doWe compare leaving, repairing, upgrading or replacing each part of your system, and show you the reasons.

    Stack Overflow, 2024
  • 80%

    of US federal IT spending typically goes on running and maintaining existing systems

    What we doWe plan the work in stages you agree, and each stage leaves the system working so you can stop after any one.

    US GAO, 2025
  • $1.52tn

    of technical debt has built up in US software, by one estimate

    What we doWe bring your framework and its dependencies up to supported versions in small releases, each checked before the next.

    CISQ, 2022
  • 60 years

    is the age of the oldest of 11 critical US federal legacy systems that auditors reviewed

    What we doWe read the code, the hosting and the data, and write down how your system works today, with the risks ranked.

    US GAO, 2025

What an old system needs before anyone changes it.

Five problems owners of aging software describe to us, and what we do about each.

The problem

The people who built the system have left, and nobody is sure how it works any more.

What we do

We read the code, the hosting and the data, and write down how the system works today. You get the risks ranked, in plain language.

Nobody knows it4 done for you
  • How it is built, written down
  • Hosting and accounts listed
  • Outdated parts identified
  • Risks ranked by seriousness

Old systems. Three ways the change went.

Two public cases show what a rushed change or a postponed one can cost. A third shows a staged move. None of them is our client.

  • Regulator fine · December 2022

    A bank moved to a new platform in one weekend

    What happened

    In April 2018 TSB moved its customers' data to a new IT platform. UK regulators said the data moved successfully, but the platform failed at once, and a significant share of its 5.2 million customers were affected. It took until December 2018 to return to normal. The regulators fined TSB £48.65 million and said it had failed to organise and control the migration adequately.

    What we do about it

    We rehearse a switch-over on a copy, move in stages where the system allows it, and keep a way back.

    Source: Financial Conduct Authority
  • Government penalty · December 2023

    An airline's scheduling system gave way at the worst time

    What happened

    Over the 2022 holidays Southwest Airlines cancelled nearly 17,000 flights and stranded more than 2 million passengers. Unions blamed “antiquated” scheduling technology, and executives were reported to have admitted at a congressional hearing that the scheduling system was a problem. The US Department of Transportation ordered a $140 million penalty.

    What we do about it

    We rank the risks in your system during the assessment, so the weakest part is dealt with before a busy period finds it.

    Source: ABC7 News
  • Published account · December 2020

    A school software firm replaced its old framework piece by piece

    What happened

    ScholarPack ran on an old Python framework it could no longer upgrade. Its speaker Gareth Thomas said the team avoided a complete rewrite and moved one module at a time, choosing modules that already needed changes. He said customers were already feeling the benefit. The account gives no figures.

    What we do about it

    We replace an old system in controlled milestones, so the business keeps running on it while the work goes on.

    Source: InfoQ

Our own work

Live products we built. Open them and judge the work for yourself. Work for private clients is shared on a call, with the client's agreement.

See all case studies

Legacy software modernization, one safe step at a time.

What every modernization project with us includes.

  • 01

    A written assessment

    How the system works today, with the risks ranked.

  • 02

    A safety net first

    Backups, change history, monitoring and tests before any change.

  • 03

    A staged roadmap

    What to repair, replace or leave, in an order you agree.

  • 04

    Small releases

    One controlled change at a time, each checked before the next.

  • 05

    A rehearsed data move

    Tried on a copy first, with a way back.

  • 06

    Notes for the next developer

    How it is built and how to release it, in your own repository.

Why work with Sun Software on your application modernization?

The system pays your bills today. It has to keep doing that while it changes.

We make your system safe to touch before we improve it. We tell you honestly which parts need replacing and which are fine as they are. The work is planned in stages, so you can stop after any one of them and still be better off.

The Sun Software team

  • 01

    Stabilize before we change

    Backups, monitoring and tests go in first, so every later change can be checked and undone.

  • 02

    A rewrite only where it is needed

    We compare repair, upgrade and replacement for each part, and show you the reasons.

  • 03

    Stages you can stop at

    Each stage leaves the system working and in a better state than before.

  • 04

    Written down and in your hands

    The code, the accounts and the notes on how it all works are yours.

What clients say about redesigns.

Word for word from Fiverr. The first 2 reviews name this work; the rest are about how we work.

  • Seller did an excellent job of redesigning my site. Communication was quick and responsive. Requested revisions were handled quickly and professionally. I recommend and would use again for future jobs.
    Client in United StatesJanuary 2023 · Fiverr review
  • Sagheer helped us with our hosting migration and website customisation task. Not only he has the knowledge & expertise to complete the task but his professional and calm manner is to no match. He not only helped us with the tasks mentioned in original order but also provided the much needed support post delivery. Highly recommended without a doubt!
    Client in ArgentinaMarch 2021 · Fiverr review
  • Great....very professional, delivered on time and exactly as I needed. Exceptional. I always find Sunsoft very easy to work with, always helpful and I'll continue using their services for the foreseeable future. No need to go anywhere else.
    Client in United KingdomOctober 2026 · Fiverr review

Questions about application modernization

What do application modernization services include?

An assessment, a safety net and then small, staged changes. You get a written assessment, backups and tests before any change, a staged roadmap, small releases, a rehearsed data move and notes for the next developer.

Can users keep working during a migration?

Often, with a phased plan. It depends on the system and how the cutover is done, and we set that out before work starts.

Is it better to rebuild a legacy application than to modernize it?

Sometimes. We compare the options with their cost and risk, and recommend a rebuild only when repair would cost more over time.

What decides the price of application modernization?

Mainly age and condition, test coverage and data and downtime. We agree the scope and the price in writing before work starts.

What decides the cost of modernization?

Modernization is priced in stages, so you can stop after any one of them. Three things decide it. Age and condition: How far the code and its dependencies are from supported versions. Test coverage: Whether changes can be checked automatically, or tests must be written first. Data and downtime: How much data moves, and how little interruption the business can accept.

What happens after I contact you?

We reply within one business day. Then the work runs in 6 steps: Assess, Stabilize, Plan, Upgrade, Migrate, Hand over. Each step ends with something you can review.

  1. 1Assess My Existing System
  2. 2We reply within one business day
  3. 3Discovery call
  4. 4Step one: Assess

Ready to talk about application modernization?

We start with what must be preserved, what must change and what should happen first.

  • The first conversation is free
  • NDA before you share anything
  • A reply within one business day